Power System Infrastructure & Detailed Design
CLIENT: Energex
Cell was engaged by an Energex subcontractor to develop detailed designs for a new $60M 200MVA Battery Energy Storage Substation. Cell was responsible for the following designs:
- 300MVA 275kV/33kV incoming substation
- 25 x 33kV Feeder Panel switchboard and switchroom
- 82 x 4MVA RMU kiosk Substations and associated BESS systems.
- Earthing and Lighting protection
- PLC and SCADA designs for the Substations.
- Schematics, SLDs, Termination Diagrams, Loop control, and Instrument drawings.
- Specifications and Data Sheets
- Protection Studies (Fault level, Load flow, Protection settings)
Time Frame
Design Completed in 2025
Approx. Value
$2,000,000