BESS and Substation 275kV / 33kV

Drone shot of industrial tanks in Seattle highlights technology and engineering landscape.

Power System Infrastructure & Detailed Design

CLIENT: Energex

Cell was engaged by an Energex subcontractor to develop detailed designs for a new $60M 200MVA Battery Energy Storage Substation. Cell was responsible for the following designs:

  • 300MVA 275kV/33kV incoming substation
  • 25 x 33kV Feeder Panel switchboard and switchroom
  • 82 x 4MVA RMU kiosk Substations and associated BESS systems.
  • Earthing and Lighting protection
  • PLC and SCADA designs for the Substations.
  • Schematics, SLDs, Termination Diagrams, Loop control, and Instrument drawings.
  • Specifications and Data Sheets
  • Protection Studies (Fault level, Load flow, Protection settings)

Time Frame
Design Completed in 2025

Approx. Value
$2,000,000