Protection Studies
CLIENT: BMA – Goonyella Riverside Mine (GRM)
Incorporated a protection and coordination study as well as an Arc Flash study for all equipment on site. Arc Flash labels for every switchboard on site, showing category ratings and PPE requirements, were developed and installed to aid electrical personnel. Cell Engineering offered a whole-of-service approach for this project, which incorporated everything from an initial site audit through to updating site documentation, implementing recommended protection settings, and completing a training course for all personnel on how to use the system.
Time Frame
Completed in 2025
Approx. Value (Cell Scope)
$120,000