PROJECT: Meadowbrook Underground Mine – Bowen Basin, QLD

An IT professional configuring network cables in a server rack, focusing on Ethernet connections.

PLC / SCADA

CLIENT: Dalrymple Bay Coal Terminal

The site has an extensive PLC and SCADA network (Allen Bradley / Citect) and engaged Cell to assist site personnel with continuous updates, modifications, and testing of the site systems.

This would typically include:

  • Implementing and testing operator-requested changes
  • Configuring the system to standard designs and Safety improvements.
  • Routine and statutory testing.
  • Specification and Scope development for major changes.
  • Database access and manipulation for reporting and tracking.

Time Frame:
Continues in 2025

Approx. Value:
$325,000