PROJECT: New MCC and Plant Expansion

cable, circuit, distribution, electric, electrical, electricity, energy, grid, high, industry, metal, power, station, steel, substation, supply, technology, transformer, voltage, wire, gray energy, gray power, gray industry, substation, substation, substation, substation, transformer, transformer, transformer, transformer, transformer

Functional Safety

CLIENT: Glencore – Collinsville Mine

Cell Engineering has a number of functional safety-certified engineers and was approached by the mine to complete a functional safety assessment of planned infrastructure expansions. The scope included references to AS 61508, 61511, and AS/NZS 4024 series.

The process included:

  • Develop a functional safety management Plan (FSMP)
  • Chair a functional safety risk assessment
  • Document requirements in a functional safety requirements specification.
  • Complete detailed designs for the agreed category 2 systems needed and identified from the RA.
  • Model the intended failure rates in the Sistema software.
  • Report on findings and recommendations.

Time Frame:
Completed in 2025

Approx. Value:
$19,000