Client: Glencore – Collinsville Mine
Cell completed detailed designs and project management for the installation of three (3) new HV cable reelers to replace failing existing units on the site stackers. The installation also included the replacement of the mid-point junction box with a power/control separated compartments and “C” connectors for the HV connections.
The cell was responsible for:
- Concept design and Capital cost estimates
- Detailed design drawings
- Scope of Work Documents for Civil, Mechanical, Electrical, and HV terminations.
- Project management for the installation.
- Testing and Commissioning.
Time Frame:
2021
Approx. Value:
$125,000