Replacement of an Existing Transformer with New Transformer in a New Location.

blueprints, house plans, architecture, construction, architect, plan, design, contractor, drafting, engineer, residential, blueprints, blueprints, house plans, architect, contractor, contractor, contractor, contractor, contractor, drafting, drafting, engineer

Mining and Minerals

Client: South32

Cell was engaged to provide detailed engineering design of the electrical, civil, PLC, control & communication systems associated with the installation of a new power transformer in a new location at the Primary Crushing Station (PCS).

Time Frame:
2024

Approx. Value:
$114,000